Field Splice Kit Installation


Roles: Technicians
Last updated: November 2023

Package_Contents_FSP4.png

A - Set of Splice Kit Shells

B - Wire Connector

Installation


1. Strip and Connect Wires

Ensure that the wires are a compatible gauge and width

FSK_SSpec_Sheet_Page_01_FINAL_A.png

Strip 3/16” of sheathing from each wire end, connect each wire to the Connector, and tighten.

Wire_connector.png

2. Align Connector

Place the Wire Connector into the shell using the post in the center. Channel the wires into the grooves.

Align_connector.svg

3. Seal Shut

Test wired connections before sealing. Ensure all four clips are engaged and apply pressure.

Group_6.svg