NM4-I Installation


Roles: Plumbers, Certified Installers
Last updated: September 2023

NextMeter-Indoor-Lid.svg

Installation


1. Attach meter couplings

Secure couplings set to the water line and place new gaskets in each end.

Group_11.svg

2. Ensure correct spacing

The water line should be parallel and should have a spacing of 7.5"or 177.8 mm.

Group_13.png

Caution

Spacing should allow for meter without pushing, pulling, or kinking the line.

3. Secure the NextMeter

Place the NextMeter and tighten both ends to a max torque of 11 ft-lb using a flat jaw or monkey-style wrench.

Group_14.svg

Caution

Do NOT overtighten meter couplings as this may result in the gaskets not forming a proper seal


Pressurize the water line and check for any leaks at both connection points

Group_23.svg

4. Verify NextMeter communication

Open the NextMeter register lid. The Meters’s RF LED will blink green when it is able to communicate with its Gateway.

Group_8.svg

Note

The NextMeter must be programmed in the NextCentury Cloud and its Gateway must be online, in order for it to begin communicating with its Gateway.