Installation

NC5-Render.webp

Installation


1. Remove lid cutout

Remove the round mounting cutout from the meter pit lid, exposing the lid’s mounting hole.

Pit Lid Cover Being Removed.png

2. Secure the NextConnect to the lid

Insert the NextConnect through the mounting cutout and secure it to the lid using the provided mount nut.

Installation Graphic (C).png

3. Connect cables

Splice the wiring of the NextConnect and the water meter. Follow the wiring guide below for your specific meter.

NextConnect Wiring Guide.png

 

4. Verify NextConnect communication

Use a magnet to verify device connectivity. A magnet swipe on the top of the lid initiates a check-in. The LED will blink green when the NextConnect communicates with the Cloud.

Communication between NextConnect and Cloud.png

If green blinks are not seen, you may need to install additional network equipment nearby. The magnet swipe can be repeated to retry.

Note

The NextConnect must be programmed in order for it to begin communicating with the NextCity Cloud.

Additional Setup

Programming Configuration

Programming is the process of associating the device's serial number with the location and utility type where it is installed.

To quickly program a large number of devices at once, you can use the CSV file uploader tool on the NextCity Web Portal. The web portal also offers a rapid programming interface to program additional devices later on.

The NextCity Mobile App is ideal for on-site programming, verification, and troubleshooting.